The station formers and stems are in place and checked for lateral alignment with a fishing line along the top and along the strongback. The keel rocker is also checked against the fishing line. The stations are also checked for vertical, fore and aft, and braced. At this point in the construction if everything is perfect the project will go easily and the optimum result can be achieved |