The station formers and stems are in place
and checked for lateral alignment with a fishing line along
the top and along the strongback. The keel rocker is also
checked against the fishing line. The stations are also
checked for vertical, fore and aft, and braced. At this
point in the construction if everything is perfect the
project will go easily and the optimum result can be
achieved. |